To fit out our premises at La Bellerine (Route de Massongex 4, Bex), we chose to work with companies from the Chablais, in Bex and nearby.

Why local companies?

Solar power produced on site

The La Bellerine building has solar panels. Their electricity is used directly on site, through a self-consumption community. For start.physio, between July 2025 and June 2026, 47% of the electricity used came from these panels, and up to 64% in spring 2026.

Electric mobility

start.physio prefers electric vehicles. A Shell Recharge charging point is available on site, Route de Massongex 4.

The companies that did the work

S-Z Sanitaire / Chauffage Sàrl

Plumbing and heating

📍 Bex

🌐 szsanitaire.ch

SN Electricité Sàrl

Electrical work

📍 Bex

🌐 snelectricite.ch

Echenard SA

Masonry and construction

📍 Bex

🌐 echenard.ch

Sol Solution Batusha Sàrl

Tiling and floor coverings

📍 Aigle

🌐 Contact (local.ch)

Donnet-Monay & Fils SA

Joinery and interior fittings

📍 Troistorrents

🌐 donnet-monay.ch

Pilloud Enseignes

Signs and signage

📍 Monthey

🌐 Facebook page

Thank you to all these companies for their work. Before / after photos of the work will be added soon.